Drawworks NOV ADS‐10SD 1500HP AC drwks with ReGen Braking capacity
NOV software limit 625,000#
Hoisting Capacity ( 10 ) lines
w/2‐AC 1150HP motor input/Gear drive | Air/ Actuated, Park Disc
1‐3/8"WireRope 6 x 19 EIP IWRC |
Prime Power NOV DrillForce LT VFD "Ideal" System
with Amphion Drillers control cabin
3‐Caterpillar 3512‐C w/Kato 1265 KW AC Generators
Dual Fuel Capabable
| Cold Start air system, primary Rig Air supply, floor hoisting systems
Fuel Capacity 20,000gal & Water Storage Capacity 400bbl |
Mast / Substructure NOV 142' 750,000# Hook load, 25' Slingshot
Crown Block 5‐50" Sheaves 1‐3/8" Groove
Fastline 1‐60" 1‐3/8" Groove
| Rotary load 750,000# Set Back 400,000
Tool Pusher and Crew quarters, rig matting boards
NOV Steel Toe Walking System |
Top Drive - Traveling Block - Pipe Handling NOV TDS 11SA AC 500 Ton Top Drive
NOV 500 Ton Traveling Block
NOV 37 1/2" Rotary Table w/400HP AC motor
NOV ST‐80CL Iron Rough Neck & CanRig hydralic catwalk | NOV Steel Toe Walking systems incorporated within lower substructure base
Manual Tongs, elevators, slips and clamps for Latshaw supplied DS |
Mud Pumps 2‐National 12‐P‐160 1600HP Triplex,
w/7,500 #WP PSI Fluid Ends and delivery system,
each driven by 2‐1150Hp AC motors | NOV BOP Control Model L200‐T6EA30CE2 3,000PSI Accumulator,
180 gal, 6 station w/remote
7‐NOV MA‐10 10HP Mud Agitatiors |
Mud System 2 ‐Tank system (1,314bbl Capacity),
2 ‐NOV King Cobra Hydro Shale Shakers | NOV DSN‐3V‐10CTX 3‐10" cone Desander 1500gpm
NOV Model DSLR‐20GG‐4CTX Desilter 20‐4" cone Desilter |
BOP Stack Description 13 5/8" 5,000# Annular
13 5/8" 5,000# Double Ram | Cameron Type FC
4‐1/1"6 10,000# x 3‐1/8"10,000# Choke Manifold
NOV Model DG‐10 Degasser |

| |